A digital control tower’s cost is the combined price of airport equipment, installation, a control center, and ongoing operations, less any funding offsets. Those layers must be priced separately. For an airport operator, the strongest financial case is not simply a cheaper replacement for a conventional tower, but a shared control center that spreads infrastructure and staffing costs across several airports.

Why airport operators are asking about cost right now

The FAA’s digital towers page places the first operational Non-Federal Control Tower digital tower system at Bartow Executive Airport in Florida in September 2026. That milestone turns a technology proposal into a procurement question. Operators can now consider a domestic operational installation rather than relying entirely on plans and overseas experience. The need extends well beyond airports replacing old towers, because only roughly 600 of more than 5,000 U.S. airports have any air traffic control tower. For the many fields without coverage, digital ATC opens a discussion about whether service is financially attainable at all.

What a digital tower system actually consists of

The FAA describes a system that uses high-definition cameras, sensors, and digital displays to give controllers a continuous, panoramic 360-degree view of the airfield and surrounding airspace. A video wall presents that view in a control center, where real-time ambient airfield audio is also reproduced. The controller’s workplace is separate from the camera mast. The FAA also lists automatic target detection, aircraft data tags, infrared cameras, and enhanced low-light visibility as tools that let controllers see more than they could from a traditional cab.

Bartow illustrates how those components fit together physically. Its installation includes a 76-foot monopole/lattice tower, a ground-level control building, and 15 screens arranged in a 130-degree arc. Its cost structure separates the mast, cameras, and sensors at the airport from the network links and control-center equipment that make their output usable. Software, maintenance, and cybersecurity form a further layer, which continues after construction and commissioning are complete.

The traditional tower as a cost baseline

Johnston Regional Airport’s estimated conventional tower construction cost is between $10 million and $20 million, much of it paid by taxpayers. That is the relevant scale of comparison for a smaller airport evaluating digital ATC. Bartow’s digital replacement cost $6.1 million and took the place of infrastructure built in 1943. The comparison is useful, but not interchangeable.

Construction is only the first barrier in that alternative. A dedicated conventional tower also requires staffing, against a backdrop of controller shortages and a constrained training pipeline. The FAA states that less than 10% of all applicants meet its requirements and are accepted into training, while the agency operates below its certified controller target. A new building does not resolve that constraint. For an airport without a tower, the financial test therefore includes both the ability to build a facility and the ability to sustain the service within it.

What airport-side installation costs in practice

Bartow provides the completed, FAA-approved U.S. installation with a cost on record, a total that must be distinguished from an itemized airport-side equipment quote for an accurate budget comparison. The $6.1 million covers the digital replacement, rather than a separately stated price for the mast, sensors, or transmission links. Johnston’s airport director estimated that a digital remote tower would cost roughly half as much as a conventional tower. That estimate is consistent with the broad comparison between Bartow and Johnston, without establishing a standard price for every airport.

Work at the airport typically includes the camera mast, sensor array, network infrastructure that links the field to the control center, and site commissioning. Approval requirements also shape the specification. The FAA requires each installation to meet its functional, performance, and operational visual requirements and to have redundancy in case equipment fails. Those provisions belong in the initial scope. The currently approved configuration covers single-runway airports in Class D airspace, giving that category a more bounded installation scope than a more complex facility would have.

The remote operations center and what it costs — and who can share it

The control center is a separate investment from the equipment at each airport, and sharing it changes the economics. Bartow’s center is set to also manage Winter Haven Regional Airport, seven nautical miles away. This is the first domestic example taking shape. It shows how an installation serving one field can become a regional hub, rather than requiring every participating airport to provide a separate control facility. Johnston’s director has described a similar prospect for a single digital remote tower serving both the Smithfield and Sanford airports.

The expansion model requires sensors at the additional field and a working position at the operations center. It avoids another complete control-center investment. No separate control-center price is given for these examples, so the evidence supports the cost-sharing structure while leaving per-airport savings unquantified. When traffic is light, the hub model also lets a controller watch multiple airports and shift most of their attention as traffic levels change.

Display systems are built to show multiple airports at once, and Norway’s record of using them supports the safety of the model. That experience supports the concept without establishing a universal staffing ratio for U.S. airports. The distinction is important to the cost case, because a shared facility and shared controller attention are related benefits, but they are not the same budget assumption.

Ongoing operational costs: staffing, maintenance, and cybersecurity

Cameras and sensors provide the visual information, while controllers continue to perform the control function. In a hub, flexible staffing can cut the number of controllers needed per airport and spread the cost of the remaining staff across the fields that share it. The expected advantage is a lower annual burden than staffing equivalent conventional towers separately. It is not a documented annual dollar saving for every installation.

Maintenance also shifts from work on a traditional tower building to work on technical equipment. Cameras, sensors, network links, and display systems require continuing support, as do backup cameras and backup data links, giving redundancy both a purchase price and a recurring cost. Degraded-mode procedures are also part of the operational provision for remote tower systems. As a result, comparing only building maintenance against the purchase of digital equipment would omit part of the digital system’s continuing commitment.

Cybersecurity adds another category to that commitment because digital towers depend heavily on communications and data transmission. Robust cybersecurity protocols and redundancy are prerequisites for safe operation. These costs belong in the operating budget. They must be included before the expected staffing advantage of a shared hub becomes a credible total-cost comparison.

Where funding comes from and what has been committed

The FAA states that the Working Families Tax Cut Act established in law a $50 million allocation to advance digital towers at qualified non-towered airports through its Brand New Air Traffic Control System initiative. Larger figures in the Department of Transportation’s budget request remain proposals and cannot be treated as committed support for an airport’s project. Budget feasibility depends on preserving that distinction between available programs and anticipated appropriations.

State funding provides a separate route, as Bartow demonstrates. The Florida Department of Transportation paid for its installation in full. Airports may also be eligible for Airport Improvement Program funding, since the FAA’s guidance allows funds for a digital tower with system design approval at Contract Tower candidates. Access therefore depends on the airport’s status as well as the equipment it selects.

Johnston and Raleigh Executive Jetport already have FAA approval for conventional towers and can use that route to seek a digital system, which could give them access to the same federal funds. Funding remains competitive and limited. The practical consequence is that an airport’s net contribution cannot be inferred from the project price alone, but neither can a prospective grant be subtracted before eligibility and support are established.

The regulatory timeline as a hidden cost

The FAA states that System Design Approval typically spans approximately 24 to 36 months, depending on product maturity and the engineering processes and documentation supporting development. Vendors submit systems for that approval. An airport must nevertheless select an approved system, and the current configuration is limited to single-runway airports in Class D airspace. Plans for an airport outside that scope need to be checked before using the assumptions made for an approved installation.

The FAA identifies the William J. Hughes Technical Center for Advanced Aerospace in Atlantic City, NJ, as the main place where the approved system is tested. The process requires time and resources beyond equipment delivery. Leesburg Executive Airport illustrates the historical uncertainty, because the FAA found its system operationally viable in 2021, but the program was discontinued by 2023. The FAA Reauthorization Act of 2024 mandated a clear framework and timeline for approving and deploying digital towers to address that regulatory drift. The framework improves planning, although the 24–36 month design-approval window remains.

For airport operators, the lesson is to begin planning before funding is in hand and account for site commissioning and public-use operation prerequisites before procurement concludes. Workforce acceptance can also shape the schedule. Scotland’s HIAL centralisation plan was abandoned after controller union opposition and Scottish Government budget cuts, illustrating a human and budgetary obstacle. U.S. airports adding service where none existed avoid that conflict over lost jobs because they have no local controller jobs to remove. These differences make feasibility a question of the airport’s circumstances as well as the maturity of the technology.

How an airport operator can assess whether the numbers work for their situation

An operator should start by looking at what other choice the airport has for service. For a field without a tower, that may be continued operation without ATC coverage, rather than a fully funded conventional tower waiting to be built. That alternative has safety costs as well as financial consequences. The comparison should keep the cost of getting service separate from the savings from replacing an existing facility. Even if one option costs less to build, the airport may be unable to afford either one.

The next step is to match the airport to the approved scope and the available infrastructure. Runway count is an immediate constraint, while an existing building suitable for a control center may change the capital requirement. Nearby airports offer the best chance to share costs. A regional center serving two or three fields changes the allocation of both facility costs and staffing, making the planned Bartow–Winter Haven arrangement a useful domestic reference. State transportation programs, Airport Improvement Program eligibility, and the federal allocation then determine which funding offsets may be available.

Operators should plan for a multi-year process, including vendor design approval if a new system is involved, followed by site commissioning. Early planning and funding discussions are necessary. The resulting feasibility case should separate airport-side installation, control-center investment, recurring operations, and funding rather than collapse them into a single headline price. For an eligible airport with a credible hub opportunity, digital ATC is now a defined infrastructure and service decision, with a completed domestic installation against which to judge the proposal.